Roof replacement

A new roof, built from the deck up for lake-effect snow

The shingles are the part you see. The parts that decide whether the roof survives February are under them: the deck, the ice and water shield at the eaves, the flashing and the airflow through the attic.

Replacing a roof in Syracuse isn't the same job as replacing one in Georgia. Here the roof spends months under snow, the eaves freeze while the upper roof thaws, and meltwater gets pushed sideways and uphill. That's why we don't treat ice and water shield as an upgrade. It goes along every eave and up every valley on every roof we replace, because that's where Central New York roofs fail.

A lot of houses in the city were built between the 1880s and the 1920s, and many have been reroofed more than once without a tear-off. We take it all off. A second layer hides rot, adds weight under a heavy snow load, and keeps new shingles from lying flat. Once the deck is bare we can see it, and you can too.

Ventilation is the other half. An attic that can't breathe cooks shingles in July and melts snow in January, which feeds ice dams. We look at the soffits, the insulation and the existing vents, and set the roof up with intake low and exhaust high so the attic stays close to outdoor temperature.

Full replacements need a building permit inside the city of Syracuse, issued through the Central Permit Office at One Park Place, and the towns and villages have their own offices. We file it, schedule the inspection, and the cost is on your estimate. New York State's snow-load requirements apply to every roof we put on.

What the job covers

Full tear-off

All old layers removed so the deck can be checked and the new roof lies flat.

Deck repair

Soft sheets replaced at a per-sheet price agreed before work starts.

Ice and water shield

Along every eave and in every valley, standard on every job.

Flashing and boots

New metal at chimneys and walls, new collars on every vent pipe.

Ventilation

Soffit intake and ridge exhaust balanced for the attic you have.

Permit and cleanup

Permit pulled and inspected; yard and driveway swept with a magnet.

Roof replacement cost in Syracuse

JobTypical rangeWhat moves it
Architectural shingles, typical house$11,000 – $20,000Roof size, pitch, layers to remove
Extra layer tear-off$1,500 – $3,500Common on older city houses
Deck sheet replacement$90 – $150 per sheetOnly the sheets that need it
Standing seam metal, typical house$24,000 – $42,000Panel gauge, roof shape, snow guards
Ridge vent and soffit intake$600 – $1,800Existing soffit condition
Building permit$100 – $350City fee; towns and villages vary

Ranges are for budgeting on typical Onondaga County houses. Your number comes after we've seen the roof, written down with the materials named, and it holds for 30 days.

How a replacement day runs

  1. Protect the house. Tarps over shrubs and the foundation line, plywood against the siding where the debris chute lands, a dumpster in the drive.
  2. Tear off to the deck. Every old layer comes off. Syracuse houses often have two, sometimes three; the permit and the code expect the deck to be bare.
  3. Fix the deck. Soft or delaminated sheets are cut out and replaced. You get photos, and the count is on the invoice at the per-sheet price you saw in advance.
  4. Weatherproof the edges. Drip edge, then ice and water shield along the eaves and up every valley, then synthetic underlayment over the rest.
  5. Flash and vent. New step and counter flashing, new pipe boots, and a balanced ventilation plan: intake at the soffits, exhaust at the ridge.
  6. Shingle it and clean it. Starter strip, field shingles, hip and ridge cap. A magnet sweep of the yard and driveway, then a walk-through with you.

What the work looks like

Fresh ice and water shield membrane rolled along the eaves of a new plywood roof deck, synthetic underlayment above it
Fresh ice and water shield membrane rolled along the eaves of a new plywood roof deck, synthetic underlayment above it
A finished architectural shingle roof with a continuous ridge vent on a New York house under a clear sky
A finished architectural shingle roof with a continuous ridge vent on a New York house under a clear sky

Questions about roof replacement

How long does a roof replacement take?

Most houses are one to two days. Big or steep roofs, a lot of decking to replace, or a snowy forecast can stretch it. We don't open a roof we can't close the same day.

Can you replace a roof in winter?

Yes, on the right days. Shingles need care when it's cold and sealant strips won't set until it warms up, so we hand-seal where needed and watch the forecast closely. Spring through fall is easier, and books up faster.

Do I have to be home?

Not for the work. We'd like to meet you at the start and walk through it at the end. Move cars out of the driveway and take pictures off walls on the top floor; the hammering travels.

What about my gutters?

We check them during the estimate. If they're sound we protect them; if they're pulling away or too small for the roof, we'll price new gutters as an option.

Is a new roof worth it on an older Syracuse house?

If the roof is past its life, yes. It protects everything under it, and a well-vented roof with proper ice protection can cut ice-dam damage dramatically. On a house you plan to sell, buyers and inspectors look hard at the roof.

What warranty comes with a new roof?

The material warranty comes from the shingle or panel maker. Whatever workmanship terms apply to your job are written on the estimate itself, so you can read and compare them before you sign anything.